為了永遠給你提供最好的C_TS422_2021認證考試的考古題,PDFExamDumps一直在不斷提高考古題的品質,並且隨時根據最新的C_TS422_2021考試大綱更新考古題。在現在的市場上,PDFExamDumps是你最好的選擇。長時間以來,PDFExamDumps已經得到了眾多考生的認可。如果你不相信的話,你可以向你身邊的人打聽一下,肯定有人曾經使用過PDFExamDumps的資料。我們保證給你提供最優秀的參考資料讓你一次通過考試。

SAP C_TS422_2021 考試大綱:

主題簡介
主題 1
  • Explain and compare the different production methods in make-to-order
  • Outline production planning components and functions
主題 2
  • Identify and explain production relevant master data
  • Configure availability check for components
主題 3
  • Characterize process order elements and process order processing
  • Outline the basics and master data of advanced planning
主題 4
  • Set up an order type, apply material staging and confirmation
  • Explain line load planning and confirmation
主題 5
  • Outline both motivation and background of SAP S
  • 4HANA
  • Select and apply planning strategies, use the planning table
主題 6
  • Determine BOM item category, describe order status management and set user statuses
  • Material Requirements Planning in SAP S
  • 4HANA

>> C_TS422_2021考古題更新 <<

C_TS422_2021測試 - C_TS422_2021考試證照

當你感到悲哀痛苦時,最好是去學些什麼東西,比如通過C_TS422_2021考試,獲得該證書可以使你永遠立於不敗之地。我們的IT團隊致力于提供真實的SAP C_TS422_2021題庫問題和答案,所有購買我們C_TS422_2021題庫的客戶都將獲得長達一年的免費更新,確保考生有足夠的時間學習。成功不是將來才有的,而是從決定去做的那一刻起,持續累積,SAP C_TS422_2021考古題學習資料是根據最新的考試知識點整編而來,覆蓋面廣,是你備考的最佳助手。

最新的 SAP Certified Application Associate C_TS422_2021 免費考試真題 (Q37-Q42):

問題 #37
What are the consequences if the Dispatched operation status is set for a production order operation?

  • A. You can reschedule the order using infinite scheduling in a planing table
  • B. You can reschedule the operation using finite scheduling in planning table
  • C. You can reschedule the operation using lead time scheduling in a planning table
  • D. You can reschedule the operation using midpoint scheduling in a planning table.

答案:B,C


問題 #38
What is the purpose of a reporting point confirmation in repetitive manufacturing?

  • A. To determine the work in progress along the production line
  • B. To provide timely updates of inventory management for the staged components
  • C. To stage different components for a production line simultaneously
  • D. To reduce the total production lead time for along production line

答案:A,B


問題 #39
Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing?

  • A. Run MRP with quota arrangement.
  • B. Run MRP with automatic selection of production version.
  • C. Run PP/DS heuristics for repetitive manufacturing.
  • D. Assign planned orders manual lying the planning table.

答案:A,C


問題 #40
If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?

  • A. Fill up based on the lot size procedure
  • B. Fill up to the maximum stock level
  • C. Fill up to the reorder stock level
  • D. Fill up to the safety stoc level

答案:A


問題 #41
For what production type are production orders used?

  • A. Period and quantity-oriented production
  • B. Process manufacturing processes
  • C. Discrete manufacturing processes
  • D. Replenishment controlled by control cycles

答案:C


問題 #42
......

SAP的C_TS422_2021考試認證是屬於那些熱門的IT認證,也是雄心勃勃的IT專業人士的夢想,這部分考生需要做好充分的準備,讓他們在C_TS422_2021考試中獲得最高分,使自己的配置檔相容市場需求。

C_TS422_2021測試: https://www.pdfexamdumps.com/C_TS422_2021_valid-braindumps.html

4HANA%20Production%20Planning%20and%20Manufacturing%202021